Bathroom Remodel Costs Wellington, FL (2026 Guide)

Wellington · Palm Beach County · 2026 Cost Guide

What a bathroom remodel actually costs in Wellington.

No vague “it depends.” Here are the honest 2026 ranges for the Wellington market, what really moves the number, and a real line-item breakdown — written by a licensed general contractor who is also a construction attorney.

Where your project lands on the scale

Planning ranges · Wellington, FL · 2026
$0 $30k $60k $90k $120k+
Refresh$7k–$16k
Mid-range$17k–$34k
Full gut$30k–$55k
Luxury primary$55k–$120k+
The four tiers

Four projects, four very different numbers.

“Bathroom remodel” covers everything from swapping finishes to taking a room down to the studs and slab. Here is what each tier buys in the Wellington market, and where the money goes.

01 / Refresh

Cosmetic refresh

$7,000–$16,000
Same layout · surface updates
  • New vanity, toilet, faucet and light fixtures
  • Re-tile or refinish, fresh paint, new mirror
  • No moving of plumbing or walls
  • Best for resale prep or a tired-but-sound bath
02 / Mid-range

Mid-range remodel

$17,000–$34,000
Semi-custom · minor layout tweaks
  • Semi-custom vanity, quartz or stone tops
  • Porcelain tile floor and full shower surround
  • New shower valve, glass enclosure, exhaust fan
  • Light electrical and GFCI updates to code
03 / Full gut

Full gut renovation

$30,000–$55,000
Down to studs & slab · permitted
  • Complete demo, new substrate and waterproofing
  • Plumbing relocation, often saw-cutting the slab
  • Custom tile, curbless shower, niche and bench
  • Full permit set and inspections — done right
04 / Luxury

Luxury primary suite

$55,000–$120,000+
Spa-grade · structural in play
  • Stone slabs, custom cabinetry, freestanding tub
  • Frameless glass, heated floors, smart controls
  • Layout changes, new impact-rated windows
  • Designer-led selections and millwork
What moves the number here

Why a Wellington remodel costs what it does.

A Wellington bath — often in a larger home, sometimes on well and septic — carries requirements a quick online estimate never accounts for. These are the line items that separate a guess from a number you can build to.

01

Well & septic considerations

In the Equestrian Preserve and rural-zoned areas, many homes run on private well and septic. Adding fixtures or a large shower can stress septic capacity, and hard well water affects fixture choice.

02

Larger homes, larger baths

Wellington primary suites tend to be generous — double vanities, a separate tub and shower, more square footage to tile. More room means more material and labor.

03

HOA & community approval

Gated communities like Palm Beach Polo, Olympia and Versailles require HOA approval before work begins. We handle the submittals so the schedule holds.

04

Village of Wellington permits

The village issues its own permits and inspections for plumbing, electrical and structural work. Permitted work protects your record and your resale.

05

Impact glazing & wind-borne debris

Even inland, Palm Beach County requires impact-rated or protected glazing. Any bathroom window is a real line item a standard quote may skip.

06

2026 material pressure

Tariffs and labor demand have pushed finish and fixture pricing up versus a couple of years ago. Smart specification keeps that increase from running away with the budget.

Anatomy of an estimate

A real Wellington primary bath, broken down.

Numbers feel abstract until you see where they go. Here is a representative full-gut of a primary bathroom in a Binks Forest home — demolition through finished fixtures.

This is the kind of clarity you should expect before a single tile is ordered. Each line is scoped, priced, and tied to the written agreement — so there are no mid-project “by the ways.”

PROJECT  ·  Primary bath, full gut
SIZE     ·  10' × 12' · ~120 sq ft
SCOPE   ·  Demo · double vanity · freestanding tub · curbless shower
CODE    ·  FBC 8th Ed. · NEC 2023 · impact glazing
TERMS   ·  §725.06 agreement · Ch. 713 lien releases
Demolition & off-site disposal$2,800
Plumbing (relocation · septic-aware fixtures)$7,200
Electrical · GFCI & recessed lighting$2,800
Waterproofing & substrate$3,400
Tile — floor & shower (material + install)$8,500
Cabinetry (double vanity) & countertops$7,000
Fixtures, freestanding tub & frameless glass$8,200
Permits & inspections (Village of Wellington)$1,400
Project management & contingency$4,500
Total — turnkey$45,800
Straight answers

Wellington bathroom remodel questions.

How much should I budget for an average bathroom remodel in Wellington?
For a full, permitted remodel of a standard guest or hall bath, plan on roughly $30,000–$55,000. A cosmetic refresh can land in the $7,000–$16,000 range, while a larger primary suite with a freestanding tub, double vanity and custom tile routinely runs $55,000 and up. Scope is the real driver — the more you change behind the walls, the higher the number.
How long does a bathroom remodel take?
Most full remodels run about 4–8 weeks once construction starts, depending on scope, inspections and material lead times. Custom stone, glass and cabinetry can extend that. In a gated community, HOA approval can add lead time before demo begins, so we start that early.
Do I really need a permit?
For anything involving plumbing relocation, electrical changes or structural work — yes. The Village of Wellington requires permits and inspections, and many communities also require HOA approval. If your home is on septic, fixture changes may need extra review. We handle the permit set and inspections as part of the job.
Why are coastal Florida remodels more expensive?
Impact-rated glazing, code-grade waterproofing for our humidity, plumbing relocation, and higher finish expectations all add cost that a builder-grade bath never carried. These aren’t upsells — they’re what it takes to build a bathroom that lasts here and passes inspection.
What makes a Cartlidge estimate different?
It’s grounded in a written, code-referenced scope and a Florida-statute-compliant agreement — because the same person who builds your project is a board-certified construction attorney. You get an accurate number and contract-level protection from lien and dispute risk, before work begins.

Get a real number for your bathroom.

Tell us about your space and we’ll walk you through realistic cost bands and a clear scope — so you can plan with honest figures instead of guesses.

Book a scoping call
We Build Better · Palm Beach County, FL
CARTLIDGE CONSTRUCTION.
Licensed General Contractor · FL CRC1335809
Board-Certified Construction Attorney · Palm Beach County, FL

Cost ranges shown are 2026 planning estimates for the Wellington / Palm Beach County market and will vary with scope, finish level, site conditions and material selections. They are not a quote. For an accurate figure, request a scoped estimate.